Dear All,
I am working on a IS-U project as a BI 7.3 developer.
When a particular parent feeder is shutdown for maintenance, the DTs to which it supplies load/KWH will be routed to a temporary replacement feeder. When the parent feeder is up again the DTs are routed back. At the end of the month, this feeder and its child aggregate DTs will show discrepancy in per month reading because DTs reading > Parent feeder DT. Total DT redaing will consider load during supplied during the time its parent was shutdown.
This activity should be standard in IS-U because would be the case in every utilities enterprise. An activity that reconciles parent feeder and replacement readings to match child DTs aggregate reading. In short between the parent feeder and DTs reading there should be minimum loss% (loss through copper wires is inevitable) But I am not able to find this in IS-U and is there a standard BW extractor which shows that the discrepancy between feeder reading and DTs is due to which replacement feeder and how much KWH was transferred during maintenance time?
This same scenario applies to DT to consumer.
Regards,
Cleo.