Dear All,
I have a basic question about BI 7.3 installation; In our organization we are planning to install BI 7.3 system as ABAP+JAVA stack installation, but what I understand from SAP documents that SAP strongly recommend to install both the systems as separate stacks.
Now issue is we cannot afford one extra system for BI implementations as BI system will be used by small number of users.
So question is
Can I install ABAP+JAVA dual stack (With Same SID) for BW 7.3
If yes then Will NW 7.3 installation master gives this option?
If not then what would be the best possible way to achieve the separate stack installation on single server (NO MCOD please)
Any inputs will be highly appreciated.