Hello Experts,
We are in the process of upgrading BW 7.31 and ECC EHP6 in our environment. We have completed Dev and Q . I would like to get some clarifications on APP server upgrade/Re-install for Prod (ABAP only)
Version :- ECC EHP4 to EHP6, BW 7.01 to 7.31
Please suggest
1. DEV installed with XML stack
2. Q installed with same XMl stack (no appservers)
3. Prod has app servers in it. So when I try to generate new XML file for prod, it downloads latest IGS,SAPHOSTAGENT, and other plugin tools which we dont want to differ from dev and QA.
4. So when I use same QA XML file with change in prod name, SUM takes it but how about application server ?
5. I know, there is an option to "UPDATE Application server" in SUM tool . Is that dynamic ? which is smart enough to recognize app servers based on profile directory ? if not, can ABAP application server can be upgraded after CI ?
6. Or ABAP application servers require re-installation from scratch using old profiles.
Please suggest
Thanks
Yoga